Fifth Day: April 24, 2008 [Thursday]

Date: April 24, 2008 [Thursday]

Morning

Time In: 8:00 AM

Time Out: 12:00 PM

Afternoon

Time In: 1:00 PM

Time Out: 6:00 PM

The whole day was filled with the following tasks:

  • Inspection on Building 2, Ground Floor for Room Turnovers. An ocular inspection was performed in order to have a daily report on the accomplishment of Building 2. The rooms in the first level of Building 2 are supposed to be handed over to the CDU Group by Friday, April 25, 2008, for them to perform the tiling works and have the necessary details in the rooms installed such as the beds and tables, sinks and other fixtures. However, as i was done expecting the building by afternoon, I was doubting if there are rooms ready enough to be handed over to them. There was still a room without air condition opening above the window. I reported the situation and the Cadet Engineer requested the masonry. There were also rooms with no plaster on the walls.
  • Actual Accomplishment Report On CHB Piling and Plastering. it was sort of an update of the report I made the yesterday based on the ocular inspection I performed to obtain a Actual Accomplishment of CHB Piling and Plastering on interior and exterior walls on the three buildings. The actual accomplishment will be used as a weekly report in comparison with the theoretical accomplishment. This will also be the basis during the billing of the sub-contractors especially those who are handling the masonry.
  • Estimate Volume to be Poured with Concrete Mixture. Volume of roof beams in building 2, columns in building 2 and slab on the fourth level of building 1 was estimated. This was prior to the pouring of concrete and for the Concrete Pouring Request which will be signed by all sub-contractors and the Senior Project Manager.

Post a Comment