Fourth Day: April 23, 2008 [Wednesday]

Date: April 23, 2008 [Wednesday]

Morning

Time In: 8:00 AM

Time Out: 12:00 PM

Afternoon

Time In: 1:00 PM

Time Out: 6:00 PM

Just a typical day in the site. I was filled with the following tasks:

  • Inspection on Building 2, Ground Floor for Room Turnovers. I did ocular inspection in every rooms in the building I am assigned to inspect everyday prior to room turnovers to the CDU Group. I have observed that the improvement is very slow. The sub-contractor of the masonry informed me that they are prioritizing building 3 since it way ahead from building 2, with respect to its structural accomplishment. i did ocular inspection during the morning and the afternoon before I left the site to have a daily report on the status of the building so as to inform the Cadet Engineer.
  • Actual Accomplishment Report On CHB Piling and Plastering. I did another ocular inspection on the three buildings to obtain an actual accomplishment percentage of CHB Piling and Plastering on Exterior and Interior Walls. This is to have a comparison on the theoretical accomplishment prepared by the Cadet Engineer. This will be graphically presented through the S-Curve wherein the comparison between the Theoretical Accomplishment and the Actual Accomplishment is depicted and the number of days the project id ahead or delayed is shown.

Based on the ocular inspection made, a report was submitted to the Cadet Engineer regarding the accomplishments on Buildings I am assigned. The Actual Accomplishment is greater than the Theoretical Accomplishment, with a variance of 20 days.