Eleventh Day: May 2, 2008 [Friday]

Date: May 2, 2008 [Friday]

Morning

Time In: 8:00 AM

Time Out: 12:00 PM

Afternoon

Time In: 1:00 PM

Time Out: 7:00 PM

The whole day was filled with much enthusiasm and pressure in the site. Most of us were busy preparing for the topping off which will be held on the slab of the water tank in the fourth level between building 1 and building 2. During the morning, my classmate and I were tasked to prepare for the way where the CDU Group and all the people involved in the topping off will pass through by placing caution tape along the way. We also made a welcome sign for the visitors.

The topping of started nearly 2:00 pm which consisted of Dr. Potenciano V. Larrazabal Jr., President of Cebu Doctor’s University, Engr. Rey Incorporado, the one who design the architectural of Cebu Doctor’s University Dormitory, Engr. Dennis Labus and Engr. Ebenzer Requioma, Engineers representing th CDU Group, Archt. Manuel Ambos Jr, the Senior Project Manager of the CDU Dormitory Project and Ryan Poncardas, Cadet Engineer of the said project. We took the pictures of the event for documentation purposes. Late lunch followed after. Although minor problems were encountered which caused the delay of the topping off, the event was a success.